Panel of Contractors for Section 1: Construction & Maintenance of Water and Sanitation Infrastructure Projects (cidb Grade 2ce to 9ce) and Section 2: Reinforced Concrete Works (cidb Grade 5ce to 9ce) |
SCM 27 OF 23/24 |
- |
2024-05-27 12:00 |
Supply and Deliver Cement 42.5 Strength 50kg Bags and Concrete Stone 20mm X 80 Ton by 22 Apr 24 |
10083230 - 7000011360 |
- |
2024-04-22 12:00 |
Construction of Concrete Panels Vip Toilets for Tru’s in Kwadukuza Municipality |
TENDER NO. MN: 341/2023 |
- |
- |
Construction of Concrete Panels Vip Toilets for Tru's in Kwadukuza Municipality |
MN341/2023 |
2024-04-29 10:00 |
2024-05-03 12:00 |
For the Building of Concrete Slab for Hoppers for Transnet Port Terminals in Richards Bay as Once Off. |
TPT/2024/04/0046/62845/RFP |
2024-04-15 09:00 |
2024-04-18 12:00 |
Construction of Concrete Slab for Carport at the Municipal Stores at 374 Kandahar Avenue |
- |
2024-04-10 10:00:00 |
2024-04-15 11:00 |
Supply and Delivery of Ready Mix-concrete |
- |
- |
2024-04-15 11:00 |
Tender Notice and Invitation to Tender for Znb02263/00000/00/kwa/inf/24/t - the Construction of a 3/1.8m X 1.8m Box Culvert on District Road D2312 at Km 09+160 and Repairs to Roads D866, D867 and P714 (under the Durban Region)
Closing Date: 04 Apr |
ZNB02263/00000/00/KWA/INF/24/T |
- |
2024-04-04 11:00 |
Construction of Himeville Township Concrete Roads Phase 1 (sugar Road). |
PWBS-B054/23/24 |
2024-04-02 10:00 |
2024-04-09 12:00 |
Construction of a New Perimeter Wall with Electric Fence, Parow Campus |
PT2024/03 |
- |
2024-04-17 12:00 |
The Service Provider for the Waterproofing Concrete Roofs, Wide Gutters, Concrete Columns, and Insulated Roofs for All the Dbsa Campus Buildings. |
RFP033/2024 |
2024-03-27 10:00 |
2024-04-12 16:00 |
Supply and Deliver Kerbing Blocks by 14 Mar 24 |
7000011104 – (SC10081977) |
- |
2024-03-14 12:00 |
Supply & Deliver: Slab Precast Concrete by 08 Mar 24 |
7000011091(10081994) |
- |
2024-03-08 12:00 |
Supply and Deliver Concrete Pipe 450mm Dia X 2.4m Long (concrete Class 75d) by 13 Mar 24 |
10081987 - 7000011092 |
- |
2024-03-13 12:00 |
Lower Umkhomazi Bulk Water Supply Scheme (lubwss Phase 1) Construction of Ngwadini Abstraction Works, Pumping System and Rising Main: Civil, Mechanical & Electrical |
2022/084(A) |
2024-03-19 11:00 |
2024-04-18 12:00 |
Tender Notice and Invitation to Tender for Znb02263/00000/00/kwa/inf/24/t - the Construction of a 3/1.8m X 1.8m Box Culvert on District Road D2312 at Km 09+160 and Repairs to Roads D866, D867 and P714 (under the Durban Region)
Closing Date: 16 Apr |
- |
- |
2024-04-16 11:00 |
The Construction of a 3/1.8m X 1.8m Box Culvert On
District Road D2312 at Km 09+160 and Repairs to Roads D866, D867 and P714 Under the Durban Region Cidb Grade 7ce or Higher |
ZNB02263/00000/00/KWA/INF/24/T: |
2024-03-07 10:00 |
2024-04-04 11:00 |
Re Advert: Supply and Deliver Concrete Pipes by 28 February 24 |
7000010167 – (SC10078081) |
- |
2024-02-28 12:00 |
Re Advert: Supply and Deliver Concrete Pipes by 28 Feb 24 |
7000010167 – (SC10078081) |
- |
2024-02-28 12:00 |
Re Advert: Supply and Deliver Concrete Pipes by 26 Feb 24 |
7000010167 – (SC10078081) |
- |
2024-02-26 12:00 |
Re Advert:rehabilitation & Structural Verification of Concrete Channels & Sumps for Arboretum Macerator by 27 Feb 24 |
7000010769 – (SC10080060) |
2024-02-22 10:00:00 |
2024-02-27 12:00 |
Southern Wastewater Treatment Works:
Concrete Rehabilitation of the Low-level
Storage Tank 1 and Construction of an
Electrical Sub-station and Meter Room |
WS-7780 |
2024-02-22 10:00 |
2024-03-22 11:00 |
Southern Wastewater Treatment Works: Concrete Rehabilitation of the Low-level Storage Tank 1 and Construction of an Electrical Substation and Meter Room |
WS.7780 |
2024-02-22 10:00 |
2024-03-22 11:00 |
The Works That the Contractor is to Perform Involves the Provision of an Air Quality Monitoring Systems and Associated Infrastructure in the Port of Durban.
The Required Service Will Include:
- Demolition of Existing Stations Including Foundation and Fencing,
Disposing of Rubble to a Permittable Site.
- Design, Construct Infrastructure, Supply, Installation,
Commissioning of Three (3) Air Quality Monitoring Systems and Their
Necessary Infrastructure, Including the Reinforced Concrete Plinth,
the Welded Wire Mesh Security Fencefencing with Lockable Gates
and the Keys.
- Professional Sign off (certification) Responsibilities,
- Supervision
- Installation of Lightning Protection
- And Any Other Work Arising Out of or Incidental to the Above or
Required of the Contractor for the Proper Completion of the Works in
Accordance with the True Meaning and Intent of the Contract
Document.
- Maintenance of the Systems for Thirty-six (36) Months |
TNPA/2023/10/0002/45355/RFP |
2024-02-27 10:00 |
2024-04-05 16:00 |
Supply & Install Paving Interlocks Bricks & Concrete Slabs |
SUN 697.23.24.pdf |
2024-02-20 09:00:00 |
2024-02-23 11:00 |
Supply and Delivery of Ready Mix Concrete to Various Site Within the Inland Region |
Q24/461/NM |
- |
2024-02-15 15:00 |
Umshwathi Bulk Water Supply Scheme Phase 4: Construction of 7 Km Long Dn 200 Steel Pipe and 1.5 Megalitre Circular Concrete Reservoirs and Elevated Tank |
2024/079 |
2024-02-14 11:00 |
2024-03-07 12:00 |
Concrete Repairs for Two Clarifiers at Maphephethwa Waterworks |
Q24/441/SM |
- |
2024-02-09 15:00 |
Construction of Palisade Fence and Concrete Slab for Air Quality Monitoring Shelter by 07 Feb 24 |
7000010846 – (SC10080597) |
2024-02-02 09:00:00 |
2024-02-06 12:00 |
Storm Water V Drain Concrete Gabions |
SUN-698-23-24.pdf |
- |
2024-02-05 11:00 |
Paving Interlock Bricks & Concrete Slabs |
SUN-697-23-24.pdf |
- |
2024-02-05 11:00 |
Upgrade Alton Fire Station Training Yard by 01 Feb 24 |
SC 10077609 - 7000010807 |
- |
2024-02-01 12:00 |
Document for the Supply and Delivery of Ready Mix Concrete for Mdlelanto Causeway in Ward 03 |
Q023/01/17/SDRMC |
- |
2024-02-02 12:00 |
Supply and Deliver Precast Concrete Slab by 31 Jan 24 |
- |
- |
2024-01-31 12:00 |
Advert for the Ready Mix Concrete, Road Paint, End User Computer Training and High Mast Lighting 23.01.2024 |
- |
- |
2024-02-02 12:00 |
Rehabilitation & Structural Verification of Concrete Channels & Sumps for Arboretum Macerator by 29 Jan 24 |
7000010769 – (SC10080060) |
2024-01-25 10:00:00 |
2024-01-29 12:00 |
Construct Concrete Jojo Stand |
cbh 270.pdf |
2024-01-19 09:00:00 |
2024-01-26 11:00 |
The Upgrade of Main Road P494 from Km 11.600 to Km 14.000 and Construction of Culvert Structures and Cwaka River Bridge on Main Road P494 in the King Cetshwayo District Under Empangeni Region. This Project is Located in the Umfolozi Local Municipality Within the King Cetshwayo District Municipality. the Duration of the Project is 22 Months. Tenders Must Have a Minimum Cidb Contractor Grading Designation of 8ce or Higher. |
ZNB00399/00000/HOD/INF/21/T |
2024-01-19 10:00 |
2024-02-09 11:00 |
For the Supply of Weight, Counterbalance; Type: Solid, Weight Material: Concrete |
TE/2023/09/0008/43780/RFP |
- |
2024-01-23 10:00 |
For the Suplly of Counterbalance for Durban Wagon Business Bay 39
for a Once off Purchase. |
TE/2023/09/0008/43780/RFP |
- |
2024-01-23 10:00 |
Levelling of Medical Admin Coaurtyard with 30mp a Concrete to Cater for New Boardroom |
clw-0321-23-24.pdf |
2023-12-12 10:00:00 |
2023-12-18 11:00 |
Supply and Deliver Concrete Palisade Fence at Enseleni Wwtp by 12 Dec 2023 |
SC 10078504 - 7000010494 |
- |
2023-12-12 12:00 |
To Construct Floor Drain, Concrete Topping, Manholes and Driveway at the Mechanical Workshop – La |
CQ 3618-12 |
2023-12-08 10:30:00 |
2023-12-18 12:00 |
To Construct Floor Drain, Concrete Topping, Manholes and Driveway at the Mechanical Workshop - Lavoipierre Yard |
CQ3618-12 |
2023-12-08 10:30 |
2023-12-18 12:00 |
Concrete Repairs for Two Clarifiers at Maphephethwa Waterworks |
Q23/445/SM(A) |
- |
2023-12-11 15:00 |
Supply and Delivery of Concrete Stones and Crusher Run |
- |
- |
2023-12-05 11:00 |
Replace Concrete Roof Slab Torch on Waterproof and Replace Some Ibr and Corrugated Sheeting |
LSH720-23-24 PdF.pdf |
2023-11-28 10:00:00 |
2023-12-01 11:00 |
Supply, Delivery, Relocation of Gate, Installation of Concrete Pre-cast Perimeter Fence and Razor Wire at Durban Main Centre |
TE/2023/11/0022/48897/RFQ |
2023-11-22 11:00 |
2023-11-30 11:00 |
Supply, Delivery, Relocation of Gate, Installation of Concrete Pre-cast Perimeter Fence and Razor Wire at Durban Main Centre |
TE/2023/11/0022/48897/RFQ |
2023-11-22 11:00 |
2023-11-30 11:00 |
Supply, Delivery, Relocation of Gate, Installation of Concrete Pre-cast Perimeter Fence and Razor Wire at Durban Main Centre |
TE/2023/11/0022/48897/RFQ |
2023-11-22 11:00 |
2023-11-30 11:00 |