| Panel of Minimum Three (3) to Maximum Six (06) Electrical Contractors for Implementation of Electrification Projects, Supply, Offloading, Maintenance and Repairs of Electrical Infrasructure/equipment on an as and when Required Basis for a Period of 36 Mon |
TS003/2026 |
- |
2026-05-05 12:00 |
| Panel of Minimum Three (3) to Maximum Six (06) Electrical Contractors for Implementation of Electrification Projects, Supply, Offloading, Maintenance and Repairs of Electrical Infrasructure/equipment on an as and when Required Basis for a Period of 36 Months |
TS003/2026 |
- |
2026-05-05 12:00 |
| Panel of 10 Electrical Contractors for Electrification Projects and Electrical Infrastructure Upgrades for a Period of 36 Months |
PW005/2024 |
- |
2024-10-10 12:00 |