| Appointment of Framework Contractors for Service, Maintenance, Repairs, Refurbishment and Replacement of Equipment in Substations, Mini-substations, Protection Systems, Dc Systems, Street Lighting, Area Lighting and Distribution Overhead Lines at Various Hospitals, Community Health Care Centres, Laundries, Mortuaries, Clinics and Other Healthcare Facilities for Maintenance Projects Only, Excluding Construction and Building Projects in the Free State Province Health Department. (4ep or Higher) |
DOH(FS)12/2026/2027 |
2026-08-14 10:00 |
2026-08-28 11:00 |
| Appointment of Framework Contractors for Service, Maintenance, Repairs, Refurbishment and Replacement of Electrical Installation Reticulation, Standby Generator and Uninterrupted Power Supply Equipment Installation at Various Hospitals, Laundries Within the Hospitals, Mortuaries Within the Hospitals and Other Healthcare Facilities Within the Hospitals, for Maintenance Projects Only, Excluding Construction and Building Projects in the Free State Province Health Department. (4eb or Higher) |
DOH(FS)10/2026/2027 |
2026-08-13 10:00 |
2026-08-28 11:00 |
| Appointment of Framework Contractors for Service, Maintenance, Repairs, Refurbishment and Replacement of Electrical Installation Reticulation, Standby Generator and Uninterrupted Power Supply Equipment Installation at Various Community Health Care Centres (chcs), Clinics, Stand-alone Mortuaries and Other Standing Alone Healthcare Facilities, for Maintenance Projects Only, Excluding Construction and Building Projects in the Free State Province Health Department (3eb or Higher) |
DOH(FS)09/2026/2027 |
2026-08-12 10:00 |
2026-08-28 11:00 |
| The Establishment of an Enabling Agreement for the Dc Minor Distribution Line with a Panel of 12 (twelve) Contractors for the Free State Operating Unit (fsou), Centraleast Cluster for a Period of 36 (thirty-six) Months |
E3129DXFSOU |
2026-07-08 10:00 |
2026-08-03 10:00 |
| Saps-Boithuso: Repair The Underground Cable From The Main D/Box To The Station Building, Repair The Underground Cable From The Generator To The Station And Repair The Burned Breakers In The Main D/Box |
ID-3285430B |
- |
2026-06-24 11:00 |
| Repair the Underground Cablefrom the Main D/box to the Station Building, Repair Theunderground Cable from the Generator to the Station and Repairthe Burned Breakers in the Main D/box |
ID-3285430B |
- |
2026-06-24 11:00 |
| Saps Boithuso: Repair the Underground Cable from the Main D/box to the Station Building. Repair the Underground Cable from the Generator to the Station. Repair the Burned Breakers in the Main D/box. |
ID-3285430B |
- |
2026-06-24 11:00 |
| Repair the Underground Cable from the Main D/box to the Station Building, Repair the Underground Cable from the Generator to the Station and Repair the Burned Breakers in the Main D/box |
ID-3285430A |
- |
2026-06-22 11:00 |
| Saps-Boithuso: Repair The Underground Cable From The Main D/Box To The Station Building, Repair The Underground Cable From The Generator To The Station And Repair The Burned Breakers In The Main D/Box |
ID-3285430A |
- |
2026-06-22 11:00 |
| Saps-boithuso: Repair the Underground Cable from the Main D/box to the Station Building, Repair the Underground Cable from the Generator to the Station and Repair the Burned Breakers in the Main D/box |
ID-3285430 |
- |
2026-07-03 11:00 |
| Saps-boithuso: Repair the Underground Cable from the Main D/box to the Station Building, Repair the Underground Cable from the Generator to the Station and Repair the Burned Breakers in the Main D/box |
ID-3285430 |
- |
2026-07-03 11:00 |
| Saps-boithuso: Repair the Undergroud Cable from the Main D/box to the Station Building, Repair the Underground Cable from the Generator to the Station and Repair the Burned Breakers in the Main D/box. |
ID-3285430 |
- |
2026-07-03 11:00 |
| Power Reticulation Maintenance for a Period of 5 Years |
Rec 8780(a) |
- |
2026-06-29 12:00 |
| Centlec (soc) Ltd (hereafter Referred to as Centlec), Invites Competent and Equipped Service Providers to Deliver a Service of Excavation of Cable Trenches, Repairs as Well as Installation of Cables for a Period of Thirty-six (36) Months |
CD04/2026 |
- |
2026-07-14 11:00 |
| Fwpq 247 (2025/26) Electrical Separation of Municipal Customer Care Offices and the Insurance Offices as Well as Installation of New Distribution Board, Wire, Test and Commission |
FWPQ 247 |
- |
2026-06-17 16:30 |
| Ndpwi Bfn Regional Office: Goods and Services: Supply and Delivery of Material at the Workshop |
ID-3269766 |
- |
2026-06-12 11:00 |
| Ndpwi Bfn Regional Office: Goods and Services: Supply and Delivery of Material at the Workshop |
ID-3266295 |
- |
2026-06-12 11:00 |
| Ndpwi: Bloemfontein Regional Office: Goods and Services: Supply and Delivery of Material at the Workshop |
ID-3278143 |
- |
2026-06-10 11:00 |
| Appointment of a Service Provider Replacement of the Faulty Electrical Cable at Perseus |
RFQ12312 |
- |
2026-06-10 12:00 |
| Fwpq 242 (2025/26) Supply and Delivery of Electricity Stores Material to Be Delivered at Technical Stores in Senekal Unit |
FWPQ 242 |
- |
2026-06-09 16:30 |
| Fwpq 235 (2025/26) Supply and Delivery of Electricity Material for Security Guard Room in Ficksburg Unit |
FWPQ 235 |
- |
2026-06-09 16:30 |
| Fwpq 234 (2025/26) Supply and Delivery of Electricity Cable to Be Delivered in Ficksburg Unit |
FWPQ 234 |
- |
2026-06-09 16:30 |
| Scm 57/2025/26 - Electrical Material |
SCM 57/2025/26 |
- |
2026-06-02 11:00 |
| Rfq 25-26/28 Electrical Cable |
RFQ 25-26/28 |
2026-05-27 11:30 |
2026-06-02 10:30 |
| Fwpq 215 (25-26) Advert |
FWPQ 215 |
- |
2026-05-21 16:30 |
| Fwpq 224 Supply and Delivery of Electricty Material |
FWPQ 224 |
- |
2026-05-21 16:30 |
| Panel of Minimum Three (3) to Maximum Six (06) Electrical Contractors for Implementation of Electrification Projects, Supply, Offloading, Maintenance and Repairs of Electrical Infrasructure/equipment on an as and when Required Basis for a Period of 36 Mon |
TS003/2026 |
- |
2026-05-05 12:00 |
| Panel of Minimum Three (3) to Maximum Six (06) Electrical Contractors for Implementation of Electrification Projects, Supply, Offloading, Maintenance and Repairs of Electrical Infrasructure/equipment on an as and when Required Basis for a Period of 36 Months |
TS003/2026 |
- |
2026-05-05 12:00 |
| Appointment of a Service Provider to Locate Cable Faults on as and when Required Basis for Ngwathe Local Municipality for a Period of 36 Months. |
NLM: TEC 04 [03/2026] |
- |
2026-04-13 12:00 |
| Supply, Remove, Install, Replace and Test/commission C&i Cables, Fibre Optic Cables, Junction Boxes, Trunking and Associated Accessories to Lethabo Power Station on as and when Required Basis for a Period of Five (5) Years. |
E2642GXMPLET |
2026-03-19 12:00 |
2026-04-10 10:00 |
| Cancellation Replacement of Lethabo Power Station Copper Earthing with Anti-theft Earthing I.e., Aluminium
Earthing Inclusive of Conducting Periodic Earth Mat Survey for a Period of 5 Years at Lethabo Power
Station |
E1505GXMPLETCANCEL |
- |
2026-04-08 11:00 |
| Viljonsdrift Saps: Repairs to Roof Leaking And
Damaged Ceiling |
ID-3241581 |
- |
2026-02-17 11:00 |
| Request for Quotations from Prospective Service Provider to Assess and Replace the Copper Earth (s) with Aluminium Earth (s) from Main Substation to Main Distribution Boards and Kiosk at Fidel Castro Building in Bloemfontein. |
SCMQ 317/01/2025 |
2026-02-06 09:00 |
2026-02-13 11:00 |
| Power Reticulation Maintenance for a Period of 5 Years |
Rec 8780 |
- |
2026-02-24 12:00 |
| Establishing an Enabling Agreement with a Maximum of 10 Contractors to Provide Labour, Plant, Transport and Equipment Necessary for Electrification and Infills in the Free State Operating Unit on an "as and When" Required Basis for a Period of 42 Months |
E2442DXFSOU |
2026-02-06 09:30 |
2026-02-20 10:00 |
| Panel of Suppliers for the Supply and Delivery of Lv and Mv Electrical Cables for a Period of Three (3) Years from Date of Award (as and when Required ) |
BID/03/2025-26 |
- |
2026-01-26 14:00 |
| Supply and Delivery of Cable Joints Splicing Kit |
MAPW RFQ 016/2025/26 |
- |
2025-12-12 14:00 |
| Supply and Delivery of Electro- Mechanical Material |
MAPW RFQ 011/2025/26 |
- |
2025-12-12 14:00 |
| Invitation to Tender (itt) for the Design, Manufacture, Supply and Delivery of Estimated Quantities of Optical Ground Wire (opgw) Cables on an “as and When” Required Basis for a Period of Five (5) Years. |
E2009DXGP |
2025-11-28 10:00 |
2026-01-26 10:00 |
| Test and Repair All Security Lights at Oliewen Huis Art Museum |
ID-3238466 |
- |
2025-12-04 11:00 |
| Procurement of a Panel of Three (03) Service Providers for Repairs, Servicing and Maintenance of the High Voltage Network and Substation Built Electrical Infrastructure for a Period Oh Three (03) Years. |
SCM/BID14/2025/2026 |
- |
2025-12-18 10:00 |
| Procurement of a Panel of Five (05) Service Providers for Supply and Delivery of Electrical Material for a Period of Three (03) Years. |
SCM/BID13/2025/2026 |
- |
2025-12-18 10:00 |
| Provision for Design and Construction of Electric Vehicle Charging
Infrastructure. |
E2125GXGPLET |
2025-11-21 10:00 |
2025-11-26 10:00 |
| E1507dxfsour- Driedorp Boesmanskop 22kv Line to Workshop Substation Koria 11kv Line from Workshop Substation Welbedacht Dam - Van Stadensrust 11kv Capacitor Bank for a Period of 13 Weeks. |
E1507DXFSOUR |
2025-11-17 11:00 |
2025-11-24 10:00 |
| Assess and Replace Copper Earth (s) with Aluminium Earth (s) from Main Substation to Main Distribution Boards and Kiosk at Fidel Castro Building in Bloemfontein. |
SCMQ 317/2025 |
2025-11-07 10:00 |
2025-11-14 11:00 |
| The Manufacture, Testing, Supply and Delivery of Estimated Quantities of Power Telecoms Cables in Various Ntcsa Sites on an “as and when Required” Basis Over a Period of Five (5) Years. |
E1950NTCSAMWP |
2025-11-03 10:00 |
2025-11-18 10:00 |
| Supply and Delivery of Electrical Armadec Cables |
SCMPRO16292/GGHNP/2025 |
- |
2025-10-24 16:00 |
| Centlec (soc) Ltd (hereafter Referred to as Centlec) a Municipal Entity Distributing Electricity in Mangaung Metro Invites Bids for the Maintenance and Repairs of 33kv & 132kv Overhead Lines Including the Supply of Material and Related Equipment Within Centlec’s Supply Area for Period of Thirty-six (36) Months. |
CD06/2025 |
- |
2025-11-11 11:00 |
| Dcs Kroonstad: Between Substation 2 & Med C
Transformer: Cable Fault on 6600 Volt 3 Core, 70mm Paper Lead
Cable |
ID-3246301 |
- |
2025-09-29 11:00 |
| Dcs Kroonstad: Between Substation 2 & Med C Transformer: Cable Fault On 6600 Volt 3 Core, 70mm Paper Lead Cable |
ID-3246301 |
- |
2025-09-29 11:00 |