| The Establishment of an Enabling Agreement with a Panel of Up to 40 Contractors for the Provision of Electrification Household Connections – (construction Related to Mv Line Infrastructure, Lv Infrastructure, Service Cable and Meter), Schools and Clinics – (construction Related to Mv and Lv Infrastructure, Service Cable and Meter for Schools and Clinics Only) and High Value Extensions Above R3 000 000,00 Per Project – (construction Related to Mv and Lv Infrastructure Required. Extension of Mv Line or Increase in Transformer Size, Lv Backbone, Service Cable and Meter), on an “as and When” Required Basis for Distribution Division Within the Kzn Operating Unit, Central East Cluster as and when Required. |
E2863DXKZNOU |
2026-06-08 10:00 |
2026-07-10 10:00 |
| New Installation and Rehabilitation of Existing Street Lighting Infrastructure at Inanda Dam |
Q26/502/VM |
2026-03-05 10:00 |
2026-03-18 15:00 |
| The Panel Appointment of Twenty (20) Contractors for the Provision of Supervision, Labour, Equipment, Material (except the Big Five (poles, Transformers, Meters, Conductor and Cable) and Transport (as it Will Be Required and Authorized in Specific Circumstance) for Reticulation Projects in the Kwa-zulu Natal Operating Unit, on an “as and When” Required Basis for a Period of Thirty -six (36) Months. |
KZN120 |
2024-02-09 10:00 |
2024-03-15 10:00 |