| Refurbishment of 2 X 20mva Traction Transformers at Various Substations on the Richards Bay Depot |
TRIM/2026/04/0705/4339/RFQ |
2026-05-21 11:00 |
2026-05-28 10:00 |
| Repairs and Maintenance of Electro-mechanical Equipment for Bulk Wastewater Works on as and when Required for a Period of 36 Months. |
JW OPS 078/24 |
2026-04-24 13:00 |
2026-06-04 10:30 |
| Relocation of High Mast at O.r. Tambo International Airport for a Period of Three Months |
73343... |
- |
2026-06-10 16:00 |
| The Provision of a Panel of Professional Resource Teams (prts) for the Upgrading of Informal Settlement Programme (uisp) for a Period of 36 Months |
RFP/05/01/26 |
2026-05-21 11:00 |
2026-06-11 11:00 |
| Appontment of a Contractor for Major Maintenance of 3kv Ohte and Transmission Lines (44kv, 11kv and 6.6kv Transmission Lines) on an as and when Required Basis for a Period of Thirty-six (36) Months in the Gauteng Region |
61/05/2026/GAU-(ELC) |
2026-05-26 11:00 |
2026-06-15 12:00 |
| Appointment of Electrical Supplier to Assist with Electrical Assessment at the Irene Office |
RFQ 4483 |
2026-06-11 11:00 |
2026-06-17 11:00 |
| Supply and Install Power and Lights at Unit 2 Security Tower |
RFQJW065KM26 |
2026-06-17 10:00 |
2026-06-23 16:00 |
| Re-tender
Appointment of Panel Service Provider/s in a Framework Contract for the Supply, Installation & Commissioning of Electrical Distribution Switchboards & Motor Control Centres for Various Sites at Ekurhuleni Water Care Company on an as & when Req |
ERW2510/02 |
2026-06-11 10:30 |
2026-06-25 12:00 |
| Trim/2026/04/0798/4785/rfq |
TRIM/2026/04/0798/4785/RFQ |
2026-06-22 10:30 |
2026-06-29 10:00 |
| Repair Lightning Conductor |
JW/PQ/ESS/359/2026/27 |
2026-06-22 12:00 |
2026-07-03 11:00 |
| Three Phase Power |
DOD/HQ/PQ/CMISDIVD26/26 |
2026-06-29 11:00 |
2026-07-06 08:00 |
| Upgrade of Emergency Power Distribution System for Savp Production Block 14 Including Service and Maintenance for a Period of Three (3) Years. |
RFB005/25/26 |
2026-06-19 11:00 |
2026-07-09 11:00 |
| Simmerpan Complex Dc Workshop and Battery Room Upgrade. |
E2391NTCSAMWPR |
2026-07-09 10:00 |
2026-07-21 10:00 |
| Appointment of Service Provider to Assist with the Assessment of the Electrical Infrastructure at the Irene Office |
RFQ 4483b |
2026-07-16 11:00 |
2026-07-23 11:00 |
| Request for Proposal (rfp) for the Acquisition of a Panel of Service Providers to Provide Electrical Engineering Maintenance for Acsa Airports for a Period of 5 Years |
COR8194/2026/RFP |
2026-06-11 08:00 |
2026-07-27 08:00 |
| Request for Proposals (RFP) for The provision of Mirror Steered System Electronics Design and Manufacture to the CSIR |
CSIR RFP 3736/28/07/2026 |
- |
2026-07-28 16:30 |
| Design, Supply, Installation, Testing and Commissioning of 3kv Dc Traction Substation Equipment at Welgedag |
TRIM/2026/03/0559/3808/RFP |
2026-07-15 11:00 |
2026-07-31 10:00 |
| The Provision of Lv Maintenance and Refurbishment for Eskom Distribution Network, on an as-and-when Required Basis for a Period of Three (3) Years in Gauteng Cluster |
E3110DXGPOU |
2026-07-13 13:30 |
2026-07-31 10:00 |
| To Engineer, Procure and Construct a Water Electrolysis Hydrogen Generation Plant, Which Must Be Integrated with the Existing Renewable Power Plant for green H2 Production at Eric Rosherville for a Period of Three (3) Years. |
E1256CXMWPR |
2026-06-02 10:00 |
2026-07-31 10:00 |
| Request for Bids for the Provision of Professional Services for Installation of Security Access Control Equipment at the General Aviation for Period of 24 Months for Airports Company South Africa (acsa) |
ORTIA8175/2026/RFP |
2026-07-10 10:00 |
2026-07-31 12:00 |
| Establishment of a Panel of Multi-disciplinary Professional Service Providers to Assist the Department of Land Reform and Rural Development in Planning, Designing, Implementing, Monitoring, Evaluating and Technical Support on Various Infrastructure Developments Projects in the Nine (09) Provinces on an as and when Required Basis for a Period of Thirty-six (36) Months |
5-2-2-1 DLRRD 0005 (2026-2027) |
- |
2026-08-03 11:00 |
| Design, Supply, Delivery, Installation, Testing, Commissioning and Put into Service with Limited Support of Power Quality Meters on Mv Panels at Rw Boosters Stations (zks, Mps, Eks and Pms) |
10417763R |
- |
2026-08-03 16:00 |
| Appointment of a Professional Service Provider (psp) to Render Professional Services for the Gauteng Department of Agriculture and Rural Development, Rand-west Agripark Upgrading of Existing Infrastructure |
RFQ: AGR0043/26 |
2026-07-29 10:00 |
2026-08-05 11:00 |
| Request for Proposal (rfp) for The: Design, Supply, Installation, Testing and Commissioning of 3kv
Dc Traction Substation Equipment at Welgedag |
TRIM/2026/03/0559/3808/RFP |
2026-07-15 11:00 |
2026-08-07 10:00 |
| Refurbishment of Kriel Ps Generator Circuit Breaker (gcb) Compressor Plant Control Circuit at Units 1 & 4 for a Period of 12 Months. |
E2192GXMPKRIR |
2026-07-28 10:00 |
2026-08-07 10:00 |
| The Provision of Reticulation Projects (major) for Contractors
Within Gauteng Cluster to Establish Multiple Contracts on an As
And when Required Basis for a Period of Three Years |
E3223DXGOU |
2026-07-28 10:00 |
2026-08-07 10:00 |
| Request for Quotation (rfq) for Appointment of a Service Provider for Feasibility and Concept Designs Services for Pretoria, Germiston, Durnswart and Midway Stations for a Period of Five (5) Months. |
HO/INTERSITE/54/07/2026 |
- |
2026-08-11 12:00 |
| Electrical Network Review & Reverse Engineering Drawing |
RFQ/OBP131/2026/27 |
2026-08-04 10:00 |
2026-08-11 15:00 |
| Electrical Network Review & Reverse Engineering Drawing |
RFQ/OBP131/2026/27 |
2026-08-04 10:00 |
2026-08-11 16:00 |
| East Grid Asea Imba/e Current Transformers High Risk Replacement for Avon, Impala, Mersey and Tugela Substation Cabling and Stringing |
E3248NTCSAMWP |
2026-07-28 10:00 |
2026-08-14 10:00 |
| Duvha Power Station Cooling Water Pumps Control System Plc Upgrade |
E2157GXMPDUVR |
2026-07-15 10:00 |
2026-08-17 10:00 |
| Provision of Electrical Engineering Services to the Regions of Sanparks for a Period of 3 (three) Years. |
ME-GK-0352/10 |
- |
2026-08-19 11:00 |
| Provision of Electrical Engineering Services to the Regions of Sanparks for a Period of 3 (three) Years |
ME-GK-0352/10 |
- |
2026-08-19 11:00 |
| Upgrade of Emergency Power Distribution System for Savp Production Block 14 Including Service and Maintenance for a Period of Three (3) Years. |
RFB005/25/26 |
2026-07-31 11:00 |
2026-08-21 11:00 |
| Appointment of a Panel of Service Providers to Support Municipalitiesto Conduct Section 76-80 Municipal Systems Act Process with the Focus on Section 78 Assessments for Water Services and Electricity Services for a Period of 36 Months |
SALGA/06/2026-2026-05-18-0001059-80101500 |
- |
2026-08-21 11:00 |
| East Grid Asea Imba/e Current Transformers High Risk Replacement for Avon, Impala, Mersey and Tugela Substation Cabling and Stringing |
E3248NTCSAMWP |
2026-07-28 10:00 |
2026-08-24 10:00 |
| For the Provision of High & Medium Voltage Switchgear Maintenance and Repair at Transnet Pipelines Pump Stations, Terminals and Workshops for a Period of Thirty-six (36) Months |
TPL/2026/05/0302/5195/RFP |
2026-07-22 10:00 |
2026-08-24 12:00 |
| For the Design, Supply, Installation, Commissioning and Testing of the Sulphuric Acid Storage and Dilution Upgrade Project at Duvha Power Station for a Period of Twenty-four (24) Months |
E3020GXMPDUV |
2026-06-17 10:00 |
2026-08-28 10:00 |
| Simmerpan Complex Dc Workshop and Battery Room Upgrade. |
E2391NTCSAMWPR |
2026-07-14 10:00 |
2026-08-28 10:00 |
| Upgrade of Emergency Power Distribution System for Savp Production Block 14 Including Service and Maintenance for a Period of Three (3) Years. |
RFB005/25/26 |
2026-07-23 11:00 |
2026-08-28 11:00 |
| To Appoint a Service Provider to Conduct a Survey, Prepare a Report, Supply and Carry Out Eletrical Remedial Work and Issue Eletrical Certificates of Compliance(cocs)for Nicd Blocks D& E at Cvi Sandringham |
1928338/26-27 |
- |
2026-09-01 11:00 |
| Professional Services for Multi Disciplinary Professional Team- Johannesburg Zoo Gorilla Enclosure Extention |
JCPZ/RFQ/CID01/2026 |
2026-08-31 10:30 |
2026-09-03 12:00 |
| Removal, Inspection, Manufacturing, and Replacement of 18kv Busbars for a Period of 5 Years at Kriel Power Station on an as and When Required Basis |
E3295GXMPKRI |
2026-08-05 10:00 |
2026-09-04 10:00 |
| Upgrade of Emergency Power Distribution System for Savp Production Block 14 Including Service and Maintenance for a Period of Three (3) Years. |
RFB005/25/26 |
2026-08-14 11:00 |
2026-09-04 11:00 |
| For the Supply and Delivery of Load Measuring Wheelsets for Wagons on a Once-off Period |
TFR/2026/03/0089/3716/RFP |
- |
2026-09-04 12:00 |
| General Building Maintenance,general Civil Maintenance And
Electrical Lighting and Power for Western Cape (bellville) |
TP/2026/07/0128/8221/RFP-CIDB |
2026-08-19 09:00 |
2026-09-07 16:00 |
| Provision of Major and Minor Reticulation Including the Installation of Smart Meters, Re-closers and Voltage Regulators Within Distribution Gemma Cluster-northern Cape on an as and When Required Basis Over a Period of Four (4) Years |
E2837DXNCOUR |
2026-08-29 11:00 |
2026-09-08 10:00 |
| Appointment of a Service Provider for Purposes of Undertaking a Comprehensive Bankable Feasibility Study for the Required Bulk and Reticulation Infrastructure (water, Sanitation, Electricity, Waste Management, Roads and Stormwater), for the Nkuna City Smart Town and Adjacent Villages. |
RFP132/2026 |
2026-08-14 14:00 |
2026-09-08 23:30 |
| Upgrade of Emergency Power Distribution System for Savp Production Block 14 Including Service and Maintenance for a Period of Five (5) Years. |
RFB005/25/26 |
2026-08-21 11:00 |
2026-09-09 11:00 |
| Ssc Drive Replacement Project at Matimba Power Station for 38 Months |
E3401GXMPMAT |
2026-09-02 10:00 |
2026-09-15 10:00 |