| Tender Validity for : Employee Transportation for Kriel Matla Tender |
ERI/2022/STR/07 Tender |
- |
2024-09-30 10:00 |
| Cancellation of Tender Mpkri10277gx: Kriel Power Station Hot Tapping and Line Stopping for Water Treatment Plant Pipes as and when Required for 3 Years |
MPKRI10277GX Cancellation |
- |
2024-08-02 10:00 |
| For the Maintenance, Repair, and Services of Precipitators During Outages on an as and when Required Basis at Matla Power Station for the Period of Five (05) Years |
MPMAT11218GX |
2024-07-29 10:00 |
2024-08-27 10:00 |
| Boiler, Turbine and Auxiliaries Plant Sandblasting During Outages on as and when Required Basis Over a Period of 5 Years at Matla Power Station. |
MPMAT11171GX |
2024-06-27 10:00 |
2024-07-25 10:00 |
| Provision of a Car Wash and General Fleet Service for a Period of 5 Years at Matla Power Station |
MPMAT11203GX |
- |
2024-08-07 10:00 |
| Tender Cancellation - Slurry Plant Plc & Scada System Upgrade for a Period of 2 Years at Matla Power Station |
MPMAT10723 GX |
- |
2024-08-30 10:00 |
| The Conversion of Simulator Building to Auditorium |
MPMAT11093GXR1 |
2024-07-11 10:00 |
2024-07-23 10:00 |
| Decommissioning of the Old Oil Ring Main Units, Transportation, Installation, Cabling, Testing and Commissioning of the New Ring Main Units at Kriel Power Station for a Period of 6 Months |
MPKRI11187GX |
2024-06-28 09:00 |
2024-07-08 10:00 |
| Supply and Installation of Coal Bunkers Level Indicators at Kriel Power Station for a Period of 12 Months |
MPKRI11188GX |
2024-07-02 09:00 |
2024-08-15 10:00 |
| Dredging of Swr, Awr 1 & 2 Unit 7, Old Dam Seepage Dam, New Ash Dam Seepage Dam 1 & 2, Silt Traps/ Oil Skimmer and Continuous Cleaning on Station Drain Channel and Silt Settling Ponds at Matla Ash Water Storage Dams for a Period of Five (05) Years) Upgrade Slurry Plant – Matla Power Station |
MPMAT11176GX |
2024-07-10 10:00 |
2024-07-29 10:00 |
| Supply and Delivery of Various Control and Instrumentation
Spares at Kriel Power Station, Main Stores for Engineering,
Maintenance and Outages Departments for a Period of 12
Months. |
MPKRI11186GX |
2024-06-25 10:00 |
2024-07-04 10:00 |
| The Supply and Delivery of Personal Protective Equipment (ppe) Accessories on an “as and when Required” Basis Matla Power Station- Main Stores for a Period of Two (02) Years. |
MPMAT11168GX |
2024-06-20 10:00 |
2024-07-18 10:00 |
| Provision of Boiler and Turbine Auxiliary Valves Refurbishment for the Period of 5 Years on an as and when Required Basis at Matla Power Station. |
MPMAT11169GX |
- |
2024-07-22 10:00 |
| Provision of a Hygiene Consumables Service on Daily Basis Including the Installation and Maintenance of Equipment on Request at Kriel Power Station for a Period of Two Years. |
MPKRI11099GX |
2024-06-13 09:30 |
2024-07-09 10:00 |
| Boiler, Turbine and Auxiliaries Plant Sandblasting During Outages on as and when Required Basis Over a Period of 5 Years at Matla Power Station. |
MPMAT11171GX |
2024-06-27 10:00 |
2024-07-25 10:00 |
| Provision of Boiler, Turbine and Auxiliaries Plant Cleaning for the Period of 5 Years on an as and when Required Basis at Matla Power Station |
MPMAT11170GX |
- |
2024-07-23 11:00 |
| The Supply and Delivery of C&i Critical Spares to Kriel Power Station on an as and when Required Basis for a Period of 5 Years Mpkri11166gx |
MPKRI11166GX |
2024-06-17 10:00 |
2024-07-17 10:00 |
| Supply and Delivery of Boiler Tubes at Matla Power Station for a Period of Five (5) Years. |
MPMAT11098GX |
- |
2024-07-10 11:00 |
| The Supply and Installation of Boiler Water Circulating Pump (bwcp)
Monitoring and Measurement Instrumentation (differential Pressure,
Temperatures and Flow) and Interfacing the New Signals to the T3000 Dcs For
Monitoring of the Circulation Pump System on the Hmi View Displays for Kriel
Power Station 4 Units for a Period of 2 Two Years |
MPKRI11134GX |
- |
2024-07-22 10:00 |
| Provision for Fuel Oil Plant Maintenance Services at Matla Power Station for a Period of Five (05) Years |
MPMAT11161GX |
2024-06-11 10:00 |
2024-07-15 10:00 |
| Monitoring of Critical Structures at Kriel Power Station: Cooling Towers,
Chimney Structures, Boiler Structure and Turbine Building for (3) Three Years |
MPKRI11147GX |
- |
2024-08-05 10:00 |
| Provision of Emergency Hydrocarbon and Hazardous Chemicals Substances (hcs) Spillage Response, Clean Up, Remediation, Rehabilitation Services at Matla
Power Station for Period of 5 Years |
MPMAT11150GX |
2024-06-04 11:00 |
2024-07-04 10:00 |
| Supply and Delivery of Labyrinth Seals and Assembly Air Seal Labyrinth as Stock Items
On an as and when Required Basis for a Period of Five Years (5) to Kriel Power Station |
MPKRI10484GX-Cancellation |
- |
2024-05-17 10:00 |
| Supply and Delivery of Generator H2 Dryer, H2 Skid, Co2 Evaporator, Gas Analysers
And Stator Head Tank Panel Spare Components at Kriel Power Station for Period of Five Years |
Cancel MPKRI10527GX |
- |
2024-05-16 11:00 |
| Design, Supply, and Delivery of Kriel Power Station Generator Excitation System for Unit 1,2,3&5 for a Period of 3 Years Main Stores. |
Cancellation-MPKRI10518GX |
- |
2024-05-16 11:00 |
| Refurbishment of Steam Traps Valves on Unit 1-6 During Planned (go, Mgo & Ir’s) and Unplanned (opportunity Maintenance) Outages on an as and when Required Bases for a Period of Five (5) Years at Matla Power Station. |
MPMAT11120GX |
2024-05-23 10:00 |
2024-06-10 10:00 |
| Re-issue of Provision of Transport Services for Normal Day Workers to and from Eskom Matla Power Station to Various Areas of Lesley for a Period of 5 Years |
MPMAT10739GXR1 |
2024-06-11 10:00 |
2024-06-24 10:00 |
| Provision of Secondary Cooling Pipework Replacement for Outages for Unit 1-6 at Kriel Power Station for a Period of 5 Years |
MPKRI11116GX |
2024-05-15 09:00 |
2024-06-05 10:00 |
| Provision of Catering Service at Kriel Power Station for a Period of 18 Months |
MPKRI11136GX |
- |
2024-05-30 11:00 |
| Test Replacement of 8b and 8f Station Magnets to Analyse Any Significant Increase in the Availability, Efficiency, and Reliability the Newly Proposed Design. |
MPMAT11087GX |
2024-05-07 10:00 |
2024-05-23 10:00 |
| The Supply and Delivery of Ion Exchange Resin for Kriel Power Station on an “as and When" Required Basis for the Period of Five (5) Years. |
MPKRI11107GX |
2024-04-29 10:00 |
2024-05-09 10:00 |
| Mv and Lv Switchgear Maintenance Service Outage Contract from Unit 1 to 6 on an as and when Required Basis for Period of Five (5) Years at Kriel Power Station |
MPKRI11097GX |
- |
2024-05-20 10:00 |
| Design, Locally Manufacturing (south Africa Manufactured) and Delivery of Replacement Tube Bundle for the Main Turbine (mt) (6 Off) and Boiler Feed Pump Turbine (bfpt) (6 Off) Lube Oil Coolers. |
MPKRI11092GX |
2024-04-18 08:00 |
2024-05-13 10:00 |
| Conversion of Simulator Building into an Auditorium |
MPMAT11093GX |
2024-04-22 10:00 |
2024-05-06 10:00 |
| Supply and Delivery of Unit 5 Electrostatic Precipitator (esp) Spares on an “as and when Required Basis” at Kriel Power Station for a Period of 4 Months. |
MPKRI11062PS Issue date |
2024-03-19 10:00 |
2024-04-15 10:00 |
| The Supply and Delivery of Personal Protective Equipment (ppe) Safety Shoes and Boots on an “as and when Required” Basis Matla Power Station- Main Stores for a Period of Two (02) Years. |
MPMAT11054GX |
2024-03-18 10:00 |
2024-04-18 10:00 |
| Provision of Cooling Towers Maintenance and Cleaning for the Period of 5 Years on an as and when Required Basis at Matla Power Station. |
MPMAT11043GX |
- |
2024-04-15 11:00 |
| Refurbishment of Turbine Safety Valves on Unit 1-6 During Planned (go, Mgo & Ir’s) and Unplanned (opportunity Maintenance) Outages on an as and when Required Bases for a Period of 5 Years at Matla Power Station. |
MPMAT11041GX |
- |
2024-04-09 11:00 |
| Maintenance Services and Repairs of Unit 1 to 6 Valves (boiler and Turbine), Pipe/heat Exchanger Flanges as Well as Hp Heater Leak Testing and Plugging at Matla Power Station for a Period of (05) Five Years. |
MPMAT10677GXR |
2024-03-07 12:00:00 |
2024-04-30 10:00 |
| Design, Interface, Install and Commission a Public Address Management System That is Compatible with Existing Toa V-1000 Series and Toa Vx-2000 Series That is Compatible with Existing Toa V-1000 Series and Toa Vx-2000 Series. |
MPMAT10908GX |
2024-02-07 10:00 |
2024-03-26 10:00 |
| Cleaning of Ash Plant All the Way to the Ash Dam on Areas That Are Not Covered by Station Cleaning at Kriel Power Station for the Period of Five (5) Years |
MPKRI10889GX |
2024-02-15 11:00 |
2024-03-19 10:00 |