| 11kv 1600a oil-filled ner refer to rfq spec document |
GH12700083 |
- |
2026-08-28 12:00 |
| Bolted substation connector ref specification attahced |
GH12700087 |
- |
2026-08-28 12:00 |
| Supply programmable pr t2pr-5715d |
GD12700308 |
- |
2026-08-28 12:00 |
| Rfq-supply and Deliver: Meter Kiosk Electrical 9 Way 3cr 12 Steel by 28 August 2026 |
SC 10107265 – 7000017146 |
- |
2026-08-28 12:00 |
| Rfq 93925- the Supply and Delivery of Material to Preekstoelcaravan Park – Still Bay |
RFQ 93925 |
- |
2026-08-28 12:00 |
| Rfq-meter Passive Base Cover by 28 August 2026 |
70000017131(10107533) |
- |
2026-08-28 12:00 |
| Lugs;crimping;al;triangular;185mm²;16mm |
GJ12700174 |
- |
2026-08-28 12:00 |
| Clamp;pg;25-150mm/10-95mm;al-al;2 bolt |
GJ12700170 |
- |
2026-08-28 12:00 |
| Metal trunking;p8000;full set |
GJ12700171 |
- |
2026-08-28 12:00 |
| Clamp;pg;10-95mm/25-150mm;cu-al;2 bolt |
GJ12700172 |
- |
2026-08-28 12:00 |
| The Provision of Outside Plant Mv Switchgear Upgrade at Arnot Power Station for a Period Of
3 Years |
E3263GXPARN |
2026-07-30 10:00 |
2026-08-31 10:00 |
| Shear Lug, Shear Lug, Shear Lug, Shear Ferrule, Shear Ferrule, Shear Ferrule, Coil |
SQ08263955 |
- |
2026-08-31 11:00 |
| 48729 : Supply and Delivery of Electric Material Period Ending 30 June 2027 |
48729 |
- |
2026-08-31 11:00 |
| 48611 : Supply and Delivery of Breakers Period Ending 30 June 2027 |
48611 |
- |
2026-08-31 11:00 |
| Annual Service to Mv Switch Gears |
grs 200 |
2026-08-27 11:00 |
2026-08-31 11:00 |
| Tech.03.2026-27 Provision of Professional and Construction of Electrification of 500 Households at Regorogile Ext 8 (turnkey Project) |
TECH/03/2026-27 |
2026-08-12 10:00 |
2026-08-31 12:00 |
| Supply, Delivery, Installation, Commission, and Handover of Twenty-two (22) 3kva and One (1) 10kva Transformer-based and Tropicalised Uninterruptible Power Supply (ups) in Substations, Railyard Points, Berth 208/209 Control Desks, and Buildings in the Por |
TNPA/2026/07/0003/114599/RFQ |
2026-08-11 10:00 |
2026-08-31 12:00 |
| Rfq-supply and Delivery of 100 X 108/100w Led by 31 August 2026 |
SC – 10107816 – 7000017168 |
- |
2026-08-31 12:00 |
| Tpm-roll wiremarkers white |
GM12700103 |
- |
2026-08-31 12:00 |
| Term:cable;al;martco;11kv |
GJ12700180 |
- |
2026-08-31 12:00 |
| Ferrule;split weak back;cu;300mm² |
GJ12700181 |
- |
2026-08-31 12:00 |
| Jointbox;cable;3c;50mm;11kv;abc |
GJ12700177 |
- |
2026-08-31 12:00 |
| Clamp;lv;abc;54-70mm2 |
GJ12700178 |
- |
2026-08-31 12:00 |
| Fuse;oh line flying ceramic;5-15a |
GH12700106 |
- |
2026-08-31 12:00 |
| Tails for mini substations;11kv |
GH12700104 |
- |
2026-08-31 12:00 |
| C/breaker lv;mccb;150a;15ka;3p;fd |
GH12700103 |
- |
2026-08-31 12:00 |
| Contactor:sl;dilm17;240v;30a |
GH12700102 |
- |
2026-08-31 12:00 |
| Pole box;3-way;grp;electrif;60a ref drawings |
GH12700101 |
- |
2026-08-31 12:00 |
| Flashlight / Torch |
GQ08266184 |
- |
2026-09-01 11:00 |
| Supply and Delivery of Electrical Material |
ctk87-26-27 |
- |
2026-09-01 11:00 |
| Rfq-install and Commission Gsm Commanders on 132kv Substations by 01 September 2026 |
70000017170 |
2026-08-27 09:00 |
2026-09-01 12:00 |
| Rfq-install and Commission Earth Fault Indicators on Mini Subs and Rmus by 01 September 2026 |
7000017178 – (SC10107841) |
2026-08-28 08:30 |
2026-09-01 12:00 |
| Rfq-install and Commission Pendant by 01 September 2026 |
7000017177 – (SC10107129) |
2026-08-27 11:00 |
2026-09-01 12:00 |
| Jcpz/admin/scm10/2026 Supply and Delivery of Consumables Admin |
JCPZ/ADMIN/SCM10/2026 |
- |
2026-09-01 12:00 |
| Appointment of Contractor for as and when Supply and Delivery of Electrical Material in South Gauteng Region for a Period of 36 Months |
SGR/ELECT-MAT-AS-AND-WHEN-SUP-AND-DELIV/08/2026 |
- |
2026-09-01 12:00 |
| The Appointment of a Service Provider for the Supply and Installation of Electrical Geysers at the Hessequa Campus, South Cape Tvet College. |
RFQ BB36/2026 |
2026-08-25 11:00 |
2026-09-02 11:00 |
| Wires, Wires, Wires |
SQ08263957 |
- |
2026-09-02 11:00 |
| Request for Quotation -
Ups Service and Battery Replacement |
RFQ09874 |
- |
2026-09-02 11:00 |
| Supply and Delivery of Power Transmission Couplings (single Universal Joints) to Nrf-ithemba Labs, Cape Town, Faure |
iLABS-RFQ 2026-27-179 |
- |
2026-09-02 11:00 |
| Supply and Delivery of Electrification Cable at Bhekumthetho |
8/2/1/643 |
- |
2026-09-02 12:00 |
| Supply and Delivery of Electrification Cable at Makhwatheni |
8/2/1/644 |
- |
2026-09-02 12:00 |
| Seal;meter;tool-less;non-conduct;blue |
GH12700094 |
- |
2026-09-02 12:00 |
| Rfq-supply & Deliver : Electrical Stock by 01 September 2026 |
7000017186(10107842) |
- |
2026-09-02 12:00 |
| Lugs;crimping;al;round;300mm²;12mm |
GJ12700188 |
- |
2026-09-02 12:00 |
| Earth kit;11kv;mech;pilc;240-400mm²;3c |
GJ12700182 |
- |
2026-09-02 12:00 |
| Lamp;metal halide hci-t;150w;230v |
GJ12700183 |
- |
2026-09-02 12:00 |
| Ballast;hps;250w |
GJ12700193 |
- |
2026-09-02 12:00 |
| Crossarm;galv;type c 4 wire;dwg sk 3198 |
GH12700107 |
- |
2026-09-02 12:00 |
| Request for Information on Grid Forming Technologies |
E3405NTCSAMWP |
- |
2026-09-03 10:00 |
| Chandelier Pendant Light |
GQ08266206 |
2026-08-28 10:00 |
2026-09-03 11:00 |