| Supply and Replace High Pressure Geyser 200 Litres for Lourdes Clinic |
RVH106-11-2025-26 |
- |
2025-11-11 11:00 |
| Supply and Replace High Pressure Geyser 200 Litres |
RVH103-11-2025-26 |
- |
2025-11-11 11:00 |
| Firm to Remove Old Tank, Supply and Install 01 Hot Water Tank in Ward 2 (re-advert) |
UMH57.25-26 |
2025-11-06 10:30 |
2025-11-10 11:00 |
| Supply and Install Three New Boiler Tanks for Denison Phase Six Blocks at Pietermaritzburg Campus. |
RFQ-UKZN 73/25 |
2025-11-11 11:00 |
2025-11-18 12:00 |
| Addendum 1 : Supply and Install Three New Boiler Tanks for Denison Phase Six Blocks at Pietermaritzburg Campus. |
RFQ-UKZN 73/25 |
2025-11-11 11:00 |
2025-11-18 12:00 |
| NDPWI: Repair, service and replacement of gas boilers, industrial geysers, incinerators, heat pumps and laundry equipment within the jurisdiction of the JHB Regional Officefor a period of 24 months |
JHB25/19 |
2025-11-11 10:00 |
2025-11-20 11:00 |
| Ndpwi: Repairs, Service, Maintenance and Replacement of Gas Boilers, Industrial Geysers, Incinerators, Heat Pumps and Laundry Equipment Within the Jurisdiction of the Johannesburg Regional Office for a Period of 24 Months. |
JHB 25/19 |
2025-11-11 10:00 |
2025-11-20 11:00 |
| The Supply of Boiler Tubes Protection Shields and Other Boiler Accessories Spares for the Period of 7 Years. |
E2108GXLPMED |
- |
2026-01-21 10:00 |
| Ndpwi: Repair, Service and Replacement of Gas Boilers, Industrial Geysers, Incinerators, Heat Pumps and Laundry Equipment Within the Jurisdiction of the Johannesburg Regional Office for a Period of 24 Months. Cidb Grading Required is 6 Me or Higher. |
JHB 25/19 |
2025-11-11 10:00 |
2025-11-20 11:00 |
| Repair Oil Filled Boiler |
GJM-530 25.26 |
- |
2025-11-05 11:00 |
| Supply and Install Boiler Tanks |
RFQ-UKZN 73/2025 |
- |
2025-11-05 12:00 |
| Supply Remove and Install 150 Litre Geyser in Doctors Room |
MUR 159-25-26 |
2025-10-31 11:00 |
2025-11-07 11:00 |
| Service of Hydroboil at Emmaus Hospital |
EMM153-10-25 |
- |
2025-10-31 11:00 |
| Request for the Supply and Installation of 10l Under Basin Electric Water Storage Heater at the National Museum. |
Basin026 |
- |
2025-11-07 15:00 |
| Repairs Old Popd Hot Water Tank |
KEV547-25 |
2025-10-29 09:00 |
2025-11-03 11:00 |
| Electrical Steam Hot Water Services |
KEV108-25 |
2025-10-29 11:00 |
2025-11-03 11:00 |
| Request For Supply And Install Replacement Leaking Valves For Hot Water And Flush Water Tanks For Training Centre At Nicd Sandringham. |
RFQ 2133885 |
- |
2025-11-03 11:00 |
| Supply, Replacement, Installation, Testing, Commissionin and Training of 7 Heat Pumps |
QNR468.25.26 |
2025-10-30 08:30 |
2025-11-06 11:00 |
| Supply, Replacement, Installation, Testing, Commission and Training of Heat Pumps |
QNR 468/25-26 |
2025-10-30 08:30 |
2025-11-06 11:00 |
| Supply, Delivery Installation, Replacement and Repairs Geysers |
DMSA 06-2025/26 |
2025-11-05 11:30 |
2025-11-12 11:00 |
| Addendum - Scmu3-25/26-0299-fre Sourcing Rate Based Steam Reticulation System Repair and Maintenance to Frere Hospital to Be Used as and when Needed |
SCMU3-25/26-0299-FRE |
- |
2025-10-28 11:00 |
| SAPS: Howick: Repair/Replace two industrial geyser that are faulty at holding cells |
DBNQ/ID-3260205 |
- |
2025-11-04 11:00 |
| Saps: Howick: Repair/replace Two Industrial Geyser That Are Faulty at Holding Cells |
DBNQ/ID-3260205 |
- |
2025-11-04 11:00 |
| Saps: Boithuso and Selosesha Police Stations: Cluster Complaint: Repair Four Calorifiers That Are Not Working |
ID:3229759 & ID:3245157A |
- |
2025-11-05 11:00 |
| Saps: Howick |
DBNQ-3260205 |
- |
2025-11-04 11:00 |
| Services and Repairs to 2x Industrial Geyser |
DBNQ/ID-3235176 Erratum |
- |
2025-10-29 11:00 |
| Instant water heater |
GB12600168 |
- |
2025-10-22 12:00 |
| Services and Repairs to 2x Industrial Geyser |
DBNQ/ID-3235176 |
- |
2025-10-29 11:00 |
| Services and Repairs to 2x Industrial Geyser |
DBNQ/ID-3235176 |
- |
2025-10-29 11:00 |
| Scmu3-25/26-0299-fre Sourcing Rate Based Steam Reticulation System Repair and Maintenance to Frere Hospital to Be Used as and when Needed |
SCMU3-25/26-0299-FRE |
- |
2025-10-27 11:00 |
| Service to Calorifiers and Circulating Pumps at Newcastle Regional Hospital |
NEH-303-25-26 |
2025-10-14 12:00 |
2025-10-17 11:00 |
| Heat Pumps and Hot Water Tanks |
HOH0292-25-26 |
2025-10-22 10:00 |
2025-10-29 11:00 |
| Invitation to Submit Formal Written Price Quotations for the Supply and Install Gacb40ecl 20l In/outdoor Gas Geyser at Smits Tented Camp – Table Mountain National Park, Southern Section |
SLK001/2025-26R |
- |
2025-10-15 11:00 |
| Flourescent Light and Gyser |
imb 185 |
- |
2025-10-13 11:00 |
| Supply and Install Heat Pumps and Hot Water Tanks: Murchison Hospital |
RE- ADVERT: ZNQ/HOH/0292/25-26 |
2025-10-22 10:30 |
2025-10-29 11:00 |
| Servicing of 2 X 3000 Liter Hot Water Boilers. Leentjiesklip Caravan
Park |
RFQ067/2026 |
- |
2025-10-10 12:00 |
| Leeuwkop Prison: Boiler operation, services, repairs and maintenance of coal fired boilers calorifiers and all steam related components lines for a period of 24 months |
JHB25/10 |
2025-10-13 10:00 |
2025-10-23 11:00 |
| Supply, Service and Repairs to Boilers, Burners, Hot & Cold-water Tanks, Heat Exchangers, Circulation Pumps and All Other Parts Pertaining to Hot Water Systems at Die Dam & Uilenkraalsmond Holiday Resorts for the Period Ending 30 June 2028 |
T57-2025 |
2025-10-15 11:00 |
2025-10-31 12:00 |
| Major Service of Boiler No: and to Do 36 Months Government Inspection |
sap323-2025-2026 |
2025-10-07 11:00 |
2025-10-10 11:00 |
| Replace of Hot Water Storage Tank 2500 Litres (calorifier) |
NEH-297-25-26 |
2025-10-06 11:00 |
2025-10-10 11:00 |
| Leeuwkop Prison: Boiler Operation, Services, Repairs and Maintenance of Coal Fired Boilers, Calorifiers and All Steam Related Components Lines for a Period of 24 Months. Cidb Grading is Required 5me or Higher |
JHB 25/10 |
2025-10-13 10:00 |
2025-10-23 11:00 |
| Leeuwkop Prison: Boiler Operation, Services, Repairs and Maintenance of Coal- Fired Boilers Calorifiers and All Steam Related Components Lines for a Period of 24 Months |
JHB 25/10 |
2025-10-13 10:00 |
2025-10-23 11:00 |
| Rfqjw024tn25 - Supply and Installation of Water Heating Appliances |
RFQJW024TN25 |
2025-10-10 10:00 |
2025-10-17 16:00 |
| Replacement of Hot Water Storage Tank 2500 Litres |
NEH-297-25-26 |
2025-10-07 11:00 |
2025-10-10 11:00 |
| Repair Faulty Water Feeding Pump for Boiler No: 1 and 2 |
SAP326-2025-2026 |
2025-10-02 11:00 |
2025-10-08 11:00 |
| Panel of Engineering Consultants: Wet Services |
RFI-202509-00332 |
2025-10-06 10:30 |
2025-10-13 12:00 |
| Kroonstad Prison: Repair Boiler No>1 and No.2 Not Working |
ID-3235236 |
2025-10-01 10:00 |
2025-10-02 11:00 |
| Element;geyser;2kw;with pocket |
GH12600220 |
- |
2025-10-02 12:00 |
| Thermostat;hwc;35-70 celc;vkf-11 |
GH12600221 |
- |
2025-10-02 12:00 |
| O Block Residence – Repairs to Hot Water Heat Pump |
RFQ UKZN 59/25 |
2025-10-03 10:00 |
2025-10-10 12:00 |