| Annual Service of Calorifiers Around the Institution |
MUR 222_25_26 |
2026-02-05 11:00 |
2026-02-13 11:00 |
| Replace Ceiling, Paint Walls, Tile Floors, Replace Geyser & Install Air Con at Niemeyer Memorial Hospital |
NMH299 |
2026-02-06 10:00 |
2026-02-13 11:00 |
| Replace Ceiling, Paint Walls, Tile Floors, Replace Geyser & Install Air Con at Niemeyer Memorial Hospital |
NMH298 |
2026-02-06 10:00 |
2026-02-13 11:00 |
| Geyser |
EKB172.25.26 |
- |
2026-02-05 11:00 |
| Service and Repair to Hfo Plant |
Ndh574-25-26 |
2026-02-09 11:00 |
2026-02-12 11:00 |
| Supply & Deliver: Material for Hot Water System as Per the Attached List |
Cjm198.pdfAmended |
- |
2026-02-10 11:00 |
| Servicing of the Boiler |
OVI01REQ003263 |
- |
2026-02-13 11:00 |
| Kroonstad Prison:repair Boiler No.1 and No.3 Faulty |
ID-3266638 |
- |
2026-02-16 11:00 |
| Kroonstad Prison (Dcs): Repair Boiler Number 1 And 3 Faulty |
ID-3266638 |
- |
2026-02-16 11:00 |
| Kroonstad Prison (dcs): Repair Boiler Number 1
and 3 Faulty |
ID-3266638 |
- |
2026-02-16 11:00 |
| Supply & Deliver: Material for Hot Water System as Per the Attached List |
Cjm198 |
- |
2026-02-10 11:00 |
| Kroonstad Prison (dcs): Repair Boiler Number 1 and 3 Faulty |
ID-3266638 |
- |
2026-02-16 11:00 |
| Service Required to Supply and Install New Hot Water Tanks |
OSI 275-25-26 |
2026-02-03 11:00 |
2026-02-09 11:00 |
| Rfq-supply and Deliver Geysers-by 5 February 2026 |
7000016112 – (SC10102014) |
- |
2026-02-05 12:00 |
| Repair Boiler Number 2 Faulty |
ID-3266618 |
- |
2026-02-12 11:00 |
| Repair Boiler Number 2 Faulty |
ID:3266618 |
- |
2026-02-12 11:00 |
| Calorifier Plants |
stf67202526 |
2026-01-29 10:00 |
2026-02-03 11:00 |
| Supply and Install E-boils in Wards -tbh |
RFQ-1022-2026-01-177659 |
2026-02-05 09:00 |
2026-02-11 10:00 |
| Mbda 05987 Supply and Installation of a New 10-litre Franke Zip Hydro-boil Unit |
Mbda 05987 |
- |
2026-01-30 16:00 |
| Supply and Delivery of Compact Geyser Over Basin 10l |
RFQ149/2026 |
- |
2026-01-28 12:00 |
| 43248 |
43248 |
- |
2026-02-06 11:00 |
| Refurbishment/ Upgrade of Hot and Cold Water Reticulation System and Calorifiers at Schweizere Reneke for a Period of Four (04) Months. Cidb Grading 5me or Higher |
NWDOH 03/2026 |
- |
2026-02-19 11:00 |
| Refurbishment / Upgrade of Hot and Cold Water Reticulation System and Calorifiers at Tshepong Hospital for a Period of Seven (07) Months.cidb Grading 6me or Higher |
NWDOH 02/2026 |
- |
2026-02-19 11:00 |
| Supply, Delivery, Installation, Testing, Commissioning and Issuing of Certificate of Compliance (coc) of 70kw Air to Water Heat Pump at the Cedar Rock Resort for Clanwilliam Dam. Only Respondents with Cidb Grading 2me or 2eb or Higher Are Eligible to Bid. |
WTE-0463 CS |
2026-01-28 11:00 |
2026-02-12 11:00 |
| Repairs to Steam Heaters |
EST 396 |
2026-01-23 10:00 |
2026-01-29 11:00 |
| Supply and Install 20 Hydroboils (Amended) |
ADD-627-25-26 Amended |
- |
2026-01-29 11:00 |
| Replacement of Faulty Leaking Vessel Domestic Water Supply and New Geyser 250l |
KMG 95-25-26 |
- |
2025-12-17 11:00 |
| Removal of Clinkers Inside the Boiler and Cleaning of Boiler
Inaccessible Areas Using Rope Access During Outages and on an "as
And When" Required Basis at Kriel Power Station for a Period of 5
Years |
E2301GXMPKRI |
2025-12-18 14:30 |
2026-01-28 10:00 |
| Appointment of a Contractor to Execute, Repair and Complete the Water Heating System and Provide Secured Solar Geyser at Merryvale Special School in the Eastern Cape. |
RFQ087.2025 |
- |
2026-01-28 23:30 |
| Disconnect, Remove Old Tanks and Donkey Boilers . Supply, Install and Commission New Hot Water Storage Tanks with Heat Pumps for Christ the King Hospital |
ctk139-25-26 |
2025-12-11 11:00 |
2025-12-18 11:00 |
| Annual Service of Calorifiers Around the Institution |
MUR 222_25_25 |
2025-12-12 10:00 |
2025-12-19 11:00 |
| Repair of Heat Pumps at Mseleni Hospital |
MSH288-25-26H A |
- |
2025-12-12 11:00 |
| Rfq for the Operation and Maintenance of Boilers at Durban-westville Prison for a Period of Six Weeks Only |
DBN 239/2025 |
2025-12-12 11:00 |
2025-12-15 11:00 |
| Kzn Department of Social Development – School of Industries: Madadeni Rehabilitation Centre: Attend to Air Conditioners, Geyser Pumps and Coldrooms. |
ZNQ 25/88/2/3/M |
- |
2025-12-15 11:00 |
| Service to Heat Pumps at Emmaus Hospital |
EMM195-12-25 |
- |
2025-12-12 11:00 |
| Interim Service Contract for Three (3) Months On
Boiler Operations and Repairs for Fort Glamorgan Prison |
GQEQ2025/2026/177 Addendum |
- |
2025-12-10 11:00 |
| Interim Service Contract for Three (3) Months On
Boiler Operations and Repairs for Kirkwood Prison |
GQEQ2025/2026/176 Addendum |
- |
2025-12-10 11:00 |
| Interim Service Contract for Three (3) Months On
Boiler Operations and Repairs for Mdantsane Prison |
GQEQ2025/2026/175 Addendum |
- |
2025-12-10 11:00 |
| Interim Service Contract for Three (3) Months On
Boiler Operations and Repairs for St Albans Prison |
GQEQ2025/2026/174 Addendum |
- |
2025-12-10 11:00 |
| Supply and Install Heat Pump with Hot Water Vessel |
ZNQ:CTK139/25/26 |
2025-12-11 11:00 |
2025-12-18 11:00 |
| Supply and Installation of Geyser Lt |
WEH 156-25-26 |
2025-12-05 09:00 |
2025-12-09 11:00 |
| Interim Service Contract for Three (3) Months On
Boiler Operations and Repairs for Fort Glamorgan Prison |
GQEQ2025/2026/177 |
- |
2025-12-10 11:00 |
| Interim Service Contract for Three (3) Months On
Boiler Operations and Repairs for Kirkwood Prison |
GQEQ2025/2026/176 |
- |
2025-12-10 11:00 |
| Interim Service Contract for Three (3) Months On
Boiler Operations and Repairs for Mdantsane Prison |
GQEQ2025/2026/175 |
- |
2025-12-10 11:00 |
| Interim Service Contract for Three (3) Months On
Boiler Operations and Repairs for St Albans Prison |
GQEQ2025/2026/174 |
- |
2025-12-10 11:00 |
| Department of Social Development- Madadeni Rehabilitation Centre- Attend to Air Conditioners,geyser Heat Pumps and Coldrooms |
ZNQ25/88/2-3/M |
- |
2025-12-15 11:00 |
| Repair to Calorifiers |
APP254.25-26 |
- |
2025-12-02 11:00 |
| Supply Deliver Remove Existing and Install New Geysers |
APP240.25-26 |
- |
2025-12-02 11:00 |
| After Service Repairs to Heat Pumps |
ADD285-25-26 |
2025-12-02 11:00 |
2025-12-09 11:00 |
| After Service Repairs of Calorifiers |
EMM185-11-25 |
- |
2025-12-03 11:00 |