| Request for Quotation for Preventative and Corrective Maintenance of the Power Reticulation Network (mv & Lv) for a Period of 36 Months at Airports Company South Africa for Upington International Airport. |
RFQ7694 Re-issued |
- |
2026-11-25 16:00 |
| Supply and Install Electrical Items for Three Phase Aircon |
GJM-39(c) 26.27 |
- |
2026-11-05 11:00 |
| Rfq-appointment of Service Providererf18488 (electrical Installation) by 13 November 2026 |
SC 10109755 – 7000017601 |
2026-11-10 10:00 |
2026-11-13 12:00 |
| Re Advertisement Supply and Delivery of Electrical Supplies |
REQ27034 |
- |
2026-11-11 12:00 |
| Gland:cable;brass+rubber shroud;no 1 |
GJ12700417 |
- |
2026-11-09 12:00 |
| Cable;surfix;1,5mm²;cu;4c+e;pvc;blk |
GJ12700415 |
- |
2026-11-09 12:00 |
| Cable;cu;flat twin earth;2.5mm²;pvc |
GJ12700414 |
- |
2026-11-16 12:00 |
| 32mm ø9 0° solid pvc bends_white |
GJ12700413 |
- |
2026-11-09 12:00 |
| Supply and Install Electrical Items for Three Phase Aircon |
GJM-39(c) 26.27 |
- |
2026-11-05 11:00 |
| Purchase and Supply of Electrical Items |
RMH141.26.27 |
- |
2026-11-06 11:00 |
| Supply and Delivery of Electrical Material to Midmar Access Roads Project in Howick Kwazulu Natal Province |
UE-28 |
- |
2026-11-10 11:00 |
| 6mmx4 core h07 neoprene cable refer to rfq spec document |
GE12700189 |
- |
2026-11-04 16:00 |
| Clamp;lv;abc;54-70mm2 |
GJ12700409 |
- |
2026-11-06 12:00 |
| The Provision of Major and Minor Reticulation Including the Installation of Smart Meters, Re-closers and Voltage Regulators Within Distribution North-west Operating Unit on an “as and When” Required Basis Over a Period of Four (4) Years. |
E3772DXNWOU |
2026-11-05 11:00 |
2026-11-25 10:00 |
| Supply and Install Cables |
Osi 324-2026-27 |
2026-11-03 11:30 |
2026-11-06 11:00 |
| The Establishment of an Enabling Agreement for the Dc Minor Distribution Line with a Panel of 12 (twelve) Contractors for the Free State Operating Unit (fsou), Centraleast Cluster for a Period of 36 (thirty-six) Months. |
E3129DXFSOUR |
2026-11-10 10:00 |
2026-11-30 10:00 |
| Construction of Balgray Electrification Project Scheduled for 41 Household in Ward 2 |
MN14/2026-27 |
2026-11-06 11:00 |
2026-11-13 12:00 |
| Construction of Luthilunye Phase 3 Electrification Project Scheduled for 114 Household Connections in Ward 01 |
MN13/2026-27 |
2026-11-06 11:00 |
2026-11-13 12:00 |
| Fuse, Terminator, Padlocks |
SQ10264114 |
- |
2026-11-11 11:00 |
| Pvc Wire, Cable Twin, Cable Twin, Wire Pvc, Chokes, Tap Line, Bus Bar |
SQ10264103 |
- |
2026-11-11 11:00 |
| Copper Ferrule, Distribution Boxes, Ferrule, Circuit Breakers, Pvc Wire, Pvc Wire, Tinned Wire |
SQ10264094 |
- |
2026-11-11 11:00 |
| Joint Boxes, Plumbers Metal, Led Flood Lights, Cable Twin, Joints Kits, Payslips, Wire Sufix |
SQ10264087 |
- |
2026-11-11 11:00 |
| Cabtyre, Photoelctric Cell Relay, Cabtyre, Storage Boxes |
SQ10264086 |
- |
2026-11-11 11:00 |
| Term Tender for Design, Manufacture, Supply, Delivery,erection, Testing, Commissioning and Maintenance of 11 and 33 Kv Underground Cable and Accessories |
116Q/2026/27 |
2026-11-10 11:00 |
2027-01-15 10:00 |
| Term Tender for Design, Manufacture, Supply, Delivery, Erection, Testing, Commissioning and Maintenance of 11 and 33 Kv Underground Cable and Accessories |
116Q/2026/27 |
2026-11-10 11:00 |
2026-12-02 10:00 |
| Joint;full tension auto;35/fox |
GH12700243 |
- |
2026-11-03 12:00 |
| Electrical Rates for a Period of Three (3) Years |
HES-TECH 28/2627 |
2026-11-16 10:00 |
2026-12-04 12:00 |
| Rfq-polaris Ss Impala 1 Protection and Control Scheme by 05 November 2026 |
SC 10109540 – 7000017598 |
2026-11-02 09:00 |
2026-11-05 12:00 |
| Hes-tech 28/2627: Electrical Rates for a Period of Three (3) Years. |
HES-TECH 28/2627 |
2026-11-16 10:00 |
2026-12-04 12:00 |
| Transformer Platform, Heat Shrink Terminator, Paraffin, Fuse Links, Fuse Links, Paint, Go-mark Liquid Gel |
SQ10264066 |
- |
2026-11-09 11:00 |
| Torque Sheer Lug, Circuit Breaker, Lugs, Plate, Pliers, Easy Drive, Joints Splicing |
SQ10264064 |
- |
2026-11-05 11:00 |
| Garden Spades, Petrolleum Jelly, Angle Iron, Contactor, Contactor, Aluminium Splices, Aluminium Splice |
SQ10264061 |
- |
2026-11-05 11:00 |
| Fiber Cable, Fiber Cable, Fiber Cable Single, Cable |
SQ10264056 |
- |
2026-11-09 11:00 |
| Cabtyre, Cabtyre, Led A2, Led B1, Led A3 |
SQ10264055 |
- |
2026-11-09 11:00 |
| Supply, Delivery and Offloading of Aluminium Overhead Line Conductor “oak” at the Electrical Department, Sedgefield Depot: Closing Date: 4 November 2026 |
RFQ 172/2026/27 |
- |
2026-11-04 12:00 |
| Supply and Deliver of Ohte Safety Critical Goods |
10375171 |
- |
2026-11-03 12:00 |
| Rfq-new Empangeni Fire Station Power Supply by 03 November 2026 |
70000017572(10109532) |
2026-10-29 12:00 |
2026-11-03 12:00 |
| Supply and Deliver Electrical Material |
APP185.26-27 |
- |
2026-10-29 11:00 |
| Supply Electrical Material |
znq.ina.314.2026.2027 |
- |
2026-10-30 11:00 |
| Upgrading of Electricity Supply to Martje
Venter/tarkastad Hospital, Tarkastad |
SCMU3-P26/27-0891-H0 |
- |
2026-11-09 11:00 |
| Supply, Delivery, Installation and Testing of Outdoor 132 Kv and 275 Kv Switchgear and Associated Equipment for a Period of Thirty-six Months for Various Substations |
34827-5E |
- |
2026-10-30 11:00 |
| Request for Quotation (rfq) for Supply & Delivery of Electrical Material: as and when Contract at Prasa Ngr. |
PRASA/RFQ/002/10/2026 |
- |
2026-11-02 12:00 |
| Appointment of Three (03) Service Providers to Supply and Deliver Traffic Robot Equipment and Cables for a Period of Three (03) Years |
PM33-26/27 |
2026-11-05 10:00 |
2026-12-01 10:00 |
| Appointment of Three (03) Service Providers to Supply and Deliver Additional Electrical Materials for a Period of Three (03) Years. |
PM32-26/27 |
2026-11-05 10:00 |
2026-11-30 10:00 |
| Cable;silicone;2.5mm2;cu;1c;si; |
GJ12700386 |
- |
2026-11-05 12:00 |
| Cable;cu; |
GJ12700384 |
- |
2026-10-28 12:00 |
| Cable;lv flexible;35mm²;cu;1c;pvc;gry |
GJ12700383 |
- |
2026-10-28 12:00 |
| Tape;marker;polyethylene;orange;300mm |
GJ12700388 |
- |
2026-10-28 12:00 |
| Joint Boxes |
SQ10264099 |
- |
2026-11-02 11:00 |
| Supply of Maintenance Spares for Electricity |
NKO 274_26_27 |
- |
2026-10-27 11:00 |